Webinar: Impossible Metals Eureka III Plume Modeling Study

Key points

  • Four-day pilot collector test planned for January-February 2026 in the BGR contract area of the Clarion Clipperton Zone, with two modes operating at 90% and 50% collection efficiency over 4,500 and 6,700 square meters respectively.
  • Plume modeling shows 95% of suspended sediment returns to the seabed within seven days, with 93% of material remaining within the mined area.
  • Sedimentation footprint extends approximately 600-700 meters from the test site, affecting less than 4% of the trial area.
  • Pilot test designed to collect field data verifying modeling assumptions about sediment disturbance before potential commercial-scale mining.
Previous Article

Video Tour of Our Robotics Lab in Collingwood, Canada

Next Article

Chatham Rock Phosphate Limited Private Placement

Write a Comment

Leave a Comment

Your email address will not be published. Required fields are marked *

Subscribe to our newsletter

Ocean mining news, every Monday